Step-by-Step Guide: Mastering PVC Vacuum Lamination Machine Operation
Jun 30, 2025
Leave a message
SVS Series Vacuum Memmbrane Machine Operation guidance
1. Machine Preparation
- Connect all vacuum pipes securely
- Verify proper electrical connections
- Power on all system switches
2. Material Setup
- Place wood/MDF cabinet doors on the work table
- Activate table vacuum switches
- Position PVC film evenly across the table surface
- Trim excess film as needed
*Important Note: The vacuum pressure gauge comes pre-calibrated - DO NOT readjust!*
3. Vacuum Process
- Monitor until real-time pressure ("PV") matches set value ("SV")
- If PV=142, increase SV to 200
- *Note: Optimal SV varies by ambient temperature - consult our technicians for location-specific settings*
- Engage the table into the working position
- Observe material forming process
4. Completion
- Wait for completion alarm signal
- Carefully retract the work table
Technical Support:
For temperature-dependent SV values or other operational queries, please contact our service team.
